All documents

Float Plans

Gibraltar → Caribbean

The Atlantic crossing — ~3,350 nm via the Canary Islands.

Total distance
~3,350 nm
Duration
~22 days total
Depart Gibraltar
19–20 Nov 2026
Via
Las Palmas, Canary Islands (~650 nm)
Landfall
Caribbean ~13 Dec (likely St. Lucia)
Boat speed
~6.8 kn planning

Nellie is booked at Queensway Marina, Gibraltar, 15 Sep – 20 Nov. The ARC (~100 yachts) departs Las Palmas 20 Nov for Rodney Bay, St. Lucia — we will be about 5 days behind them. Daily personal weather routing via Chris Parker.

Itinerary

DatePlan
4 NovSteve arrives Queensway Marina, Gibraltar
13 NovSteven Eder arrives
19 NovWiktor & Karolina arrive (Gdansk → Malaga, FR6638)
19–20 NovDepart Gibraltar for Las Palmas (~650 nm, ~4.3 days)
25–26 NovDepart Las Palmas for the Caribbean (~2,700 nm, ~17 days)
~13 DecArrival in the Caribbean

Crew

  • Steve Bell — arrives Gibraltar 4 Nov (BA 432, 15:30 from LHR)
  • Steven Eder — from Honolulu
  • Wiktor Krzysztofowicz — from Gdansk/Warsaw
  • Karolina Krzysztofowicz — from Gdansk/Warsaw

Weather: departing Europe ~20 °C days / ~15 °C chilly nights; arriving Caribbean ~29 °C days / ~23 °C nights.

Boat parts to carry

  • Watermaker filters — 5 and 25 micron — 6 of each
  • Diesel bags — 40 L — 3 on deck
  • Diesel jerry cans — 20 L — 5 or so, plus fill fittings
  • Lewmar hatch seals — 6× size 44, 2× size 10 (ordered)
  • Spare watermaker low-pressure pump — Tellarini (ordered)

Ditch bag — check & prep

  • Water
  • Radios
  • Note pad
  • Knife
  • Fishing things
  • Medical kit

Provision for 31 days on a 21-day plan (10 days extra). Admin: Steve to file the Gibraltar pre-arrival declaration and register with caricomeapis.org.