Auto-synced from the crew's Google Sheet — last checked Oct 15, 2026. Edit the sheet and this page updates within a day.
Boatright
| Task | Notes / status |
|---|---|
| Carbon Fiber deck pole - damaged by anchor - repair | I think this is fixed? |
| DELAMINATION - delamination of deck from bulkhead at D1 port side | Kraken - survey 14October to determine fix |
| Pex pipe - replace stiff pex Refit engineering will do. | — |
| Replace hatch seals - FWD Stb cabin and FWD shower @Steve | — |
| Secure both TV’s from left right movement | — |
| Storage - Build more storage under floor in salon - water tank manifold | — |
| TV's - secure lateral movement | — |
| Front Hatches Lazarette - dog them down - re-do gaskets | — |
| SS Fabrication for mounts on Davits | Dave - electrical? |
| Bimini replacement | Prichards |
| Watertight bulk heads - forward and Aft - SEAL all the through holes | spray foam? |
| watertight bulk heads - exhaust pipe penetrations???? | https://www.roxtec.com/us/our-products/solutions/roxtec-r-transit-with-slfori/ |
| anchor windlass - rust - - clean the rust off the body of the windlass - and then paint it. I think this should be done with the windlass still mounted in anchor locker as removing the windlass - too many other issues can occur? | https://www.filoform.com/product/filoseal-duct-seal/?utm_source=chatgpt.com |
| Engine compartment - sound insulation - forward and by galley | — |
Capt
| Task | Notes / status |
|---|---|
| Buy weather routing package | steve will do |
| Check starlink data plan all good | steve will do |
| Swim blow up platform - make disposition - bring or leave | — |
| Wifi Network on boat - Redo - run ethernet to starlink. | steve to do |
| intermittant no-drift autopilot loss | https://chatgpt.com/share/6a848339-0504-83e8-ac0e-3775d2915179 |
| SPARE cooking - buy stove with cooking gas in case we loose electric cooker. | — |
| Water - Extra Jugs needed - 20 liter - 6 jugs - 2 in each cabin - on floor | Calc.. 3 L/person/day minimum water |
| hand line deployement - how to do on Nellie - test rig | — |
| Ditch Bag Prep: | — |
| passports in ditch bag | — |
| Storm Prep | — |
| GRINDER in wet locker - for cutting shrouds should mast collapse | — |
Electric
| Task | Notes / status |
|---|---|
| Find fix current leak to oven ground - PE @Wiktor | — |
| Find and fix drain of 0.9 amps from 48 v batteries when boat resting / also - why it stays in “float” with 0 amp charging. | 0.7 amps now... - also see the 24V battery bank doing similar - but much slower drop - charge and recharge 0.06 kwh daily charge and 0.09kwh discharge - each day. |
| MG LV BMS Firmware - at 1.37 - update to 1.42 | maybe cause of "standby mode" |
| Diagnose and remediate super hot 48/24 Mac plus - why so hot in standby? | i think ok now |
| 120V and USB outlet in fwd starboard room @Steve to check | — |
| Compass light - separate from button lights - need switch | — |
| Electircal Works - lets chat | https://docs.google.com/document/d/1-7XGpbsHQ-EDN6dbfuWKF1gSmbSLd4cfy_37NHCMRvw/edit?usp=sharing |
| Fix Alternator 48V >> alignment and belt tension and wakespeed settings. | — |
| Electrical - Check all major electrical connections and all battery connections for proper torque | — |
| Add RED flashing LED to alarm circuit on zeus at helm | steve is buying LED |
| Solar Install | — |
| Levante Install | TBD |
| Electrical install | TBD - Dave / Wiktor |
Rigger
| Task | Notes / status |
|---|---|
| Starboard Jib sheet - replace - chafed 15% - steve | Prichard Rigging doing now |
| Main halyard - check - Rodrigo Sanz - PRO-Rigging | Prichard Rigging doing now |
| Main halyard sheave top of mast - check - why did last halyard chafe 50%?? - need Rigger - @Steve | Prichard Rigging doing now |
| Mast Head - main halyard sheave - find and remediate main halyard chafe | I replaced main halyard in July - it is located in aft laz - port side. It was chafed good way into dyneema core where it went over the mast head sheave. I replaced with a stronger dyneema - 10 mm vs. 12 mm chafed one. Please check new halyard also |
| Mast Head - spinaker sheaves - find and remediate chafe | Spinaker halyard on port side - was used about 12 hours - is chafed badly where it went over mast head sheave - find cause and remediate |
| Spinaker Halyards - both port and starboard - replace | Starboard side halyard never ever ran well... always twisted - I hate it - please replace and put a proper selden or wichard high quality snap shackle spliced on ends of both new spinaker halyards |
| examine in deck sheaves - for wear and chafe - port and starboard | under deck - on port and starboard - stack of 4 sheaves - i suspect are causing chafe on lines - please check them all |
| check all standing rigging - inspect - top to bottom | for proper tension and corrosion - send pics please |
| check both head sail furlings and forestays | for proper tension |
| replace blade jib sheet starboard side | it is chafed - and too short for spinaker pole |
| Replace code k sheet - short one | it is too short and chafed. the speckled green one is ok - but the white with green flake - too short and chafed. - they need to be long enough for lazy sheet to be in cockpit and to operate through spinaker poles |
| Code K HALYARD - need a block at bottom and 2:1 purchase | Prichard Rigging to install - 2:1 will eliminate twisting of halyard when furling.. |
| Main Halyard - check shakle on top of main sail - make sure siezing wire and halyard in good condition | — |
General
| Task | Notes / status |
|---|---|
| Milwaukee Pack Out boxes in engine room - better way to support and secure Refit engineering will do. | — |
| LEAKS | — |
| Alternator belt for 48v alternator (Refit engineering contracted) | EMS Gib doing now |
| SOLAR PANELS - replace - @Steve has appointment with Levante. | Levante - first week November |
| Check all major electrical connections for heat - with heat gun | — |
| Rigging Jobs | — |
Done
- Cabinet latch - Fix cabinet latch on laundry room laundry access cabinet that does not latch on starboard tack. Refit engineering will do.
- Spinnaker Pole end - fabricate new collar - Refit engineering will do.
- Toilet switch - install relay
- Lee cloths for forward bunk beds (Refit engineering contracted)
- Lee cloth couch — design (Refit engineering contracted)
- Table in cockpit >> level starboard side
- Prop shaft - re-engineer (Refit engineering contracted)
- service yanmar (Refit engineering contracted)
- Service Genset (Refit engineering contracted)