All documents

Float Plans

Valencia → Gibraltar

First leg — 390 nm down the Spanish coast to the Strait.

Distance
~390 nm
Crew
Steve Bell, Brian Bell
Target departure
10 Sep 2026, Valencia
Arrival
14–15 Sep, Queensway Marina, Gibraltar
Motoring estimate
~68 hrs if no wind
Diesel estimate
~544 L (8 L/hr incl. genset)

Warm days (80°F+, swimming weather); nights cooler (~65°F, min ~55°F) — hat/sweater on watch. Burn 5.2 L/hr at 1900 rpm (5.8 kn) or 7.2 L/hr at 2300 rpm (7 kn), plus ~1.5 L/hr genset.

Itinerary

DatePlan
10 SepDepart Valencia AM — night at sea
11 SepArrive Cartagena AM — rest / explore (155 nm)
12 SepDepart Cartagena AM — night at sea
13 SepArrive Motril AM — rest / explore (150 nm)
14 SepDepart Motril ~04:00
14 SepArrive Gibraltar (100 nm)

Sample watch schedule (10 Sep)

TimeOn watch
06:00–12:00Steve
12:00–18:00Brian
18:00–22:00Steve
22:00–02:00Brian
02:00–06:00Steve — arrival 11 Sep

To-do before / at departure

  • Customs control — exit paperwork
  • Passport control — get exit stamps
  • Loosen mainsail leech line
  • Raise main halyard one click
  • Clean eisenglass on the bimini
  • Check drain openings are open on the Viking life raft valise
  • Redo the wifi network on Nellie
  • Check in advance online for Gibraltar
  • Steve: complete beacon registration — EPIRB

Provisions & safety brief

  • Provision for 5 days
  • Brian brings from home: nuun electrolytes + Nalgene bottle, Cliff bars
  • Winches — minimum 3 wraps (4 on the outhaul)
  • Clutches for main sheet (both sides) and outhaul — ALWAYS OPEN so they can fly; return to open after any short-term use
  • LI battery fire risk — no charging of any LI battery in an unattended cabin; use the salon charging area; no no-brand LI batteries aboard

Navigation rules: study Rules 11–18. Keep minimum CPA to any large vessel at least 3 nm.